You are using an outdated browser. For a faster, safer browsing experience, upgrade for free today.

Projects

Our Projects

Our Featured Projects

  • Drilling 4 development offshore wells. (WEB-NW-WE-NE – WE -SE-WEB-SW) – 2023.
  • Mobile offshore drilling unit ” ADMARINE 260 ” SC transit towed by SCA tugs from the Red Sea
    to the Mediterranean Sea at the lowest cost – 17.08.2023.
  • Drilling an offshore exploration well (NWEA – YAKOOT – IX) – 2023.
  • Drilling 2 offshore development wells (NIDOCO 9, NIDOCO 10) – 2022:2023.
  • Construction of a multi-purpose wharf (containers – general cargo) with a length of 550 meters
    and a depth of 17 meters in Safaga port – 2022:2023.
  • Dredging work for basins 3, 5, and 6 in Safaga port – 2023.
  • Rig ADM VIII docking at Suez floating dock – 2022:2023.
  • Dredging work at Al-Arish port – 2022:2023.
  • Oil drilling projects by marine rigs in the Red Sea
    (Ras Shuqair – Ras Ghareb – Jabal Al-Zeit – Abu Zinema) – 2021:present.
  • Establishing a Western breakwater in West of Damietta port and raising the efficiency and developing the Eastern breakwater in the port – 2020:2021.
  • Construction of an International Marina (Sidi Abdel Rahman Village, El Alamein) – 2020:2021.
  • Establishment of a multi-purpose terminal with an area of (56,2000 square meters) at wharfs (55, 62)
    in Alexandria port – 2020.
  • Dredging work in the process of developing and restoring the efficiency of Lake Manzala – 2019:2020 .
  • Dredging work at the third wharf at Ain Sokhna port – 2020.
  • Construction projects for marine fish cages units in Al-Tafraa – East Port Said – 2017:2018.